So, in previous part i had talked much about how do i end
up with one of renewables energy sources: Geothermal. On this particular story
i’m gonna tell you –my friends- about heavier topic of what i have done during
my internship on PT. Pertamina Geothermal Energy (PGE).
PT. PGE has own the OLDEST geothermal plant in Indonesia
(found on 1983). The company established on 2006 as a part of its mother
company, PT. Pertamina Persero. On 2012 PT. PGE Kamojang had produced dry steam
up to 12.339.808 407 tonnes and become one of an important source of
electricity for Java-Bali distribution.
As i mentioned, i had given a task by my supervisor (Mr. Sidiq
Nurbiyantoko) to sounding his result about the pressure drop from wellheads to
suction of turbine on PT. PGE’s power plant. It was actually a simple quest
which the only thing i should calculated is a ‘pressure drop’. By determining
the pressure drop, then i should evaluate which wells should i put on the
standby position and which wells should i keep to operates compare to the
existing operation. Therefore, fluid mechanics will be the main key to solve
the problem.
Still, it is have an interesting challenge. The wellheads
are not lie on the same region/area where you can easily get the data by one
spot at the time. Kamojang’s field was such a huge area of forest and each
geothermal wellhead have a different ‘path’ to where it goes. Even in the same region,
some wellheads could be ended up on different ‘finish-line’. Remember, PT. PGE
is not only distirbutes dry steam to their own power plant. They were also
exported them to the PT. Indonesia Power who also generate electrcity there.
Furthermore, working field of PT. PGE are pretty much lies on the conversation
field, that’s why although they had many wellheads to ‘mine-of’ but the
wellshead could be faraway each other.
Tiny little spots which looks like a swarm is actually the geothermal wells.
My methods to solve the problem is: First, taken a study
about geothermal (it is an obvious thing right? :p) and also do a
plant-observation. After that, I need to decide what is the main variables and
equations are require for calcualting the presure drop to seek which and how
many data that i should collected. Since the purpose is to decrease the number
of operating wellheads for its sustainability. I had chose a ‘solver-analysis’
method from Microsoft Excel to help me execute the combination of the wellheads
number, which one do i should put on standby position and which one do i should
keep operates. Simply, the methods are given on the picture below.
At the end of the result i found that the number of
wellheads could be reduced until 8 wells to fulfilled the dry steam duty for
suction head power plant’s turbine operation. Operating requirement of power
plant’s turbine is the dry steam should be minimum on 430 tonnes/hour flowrate
at 11.50 bar pressure. My recommendation result (8 wells) is the dry steam on
481.16 tonnes/hour flowrate with 11.70 bar pressure. In fact, number of wells
which operates during my internship is 9 and produced approximately 511.29
tonnes/hour flowrate dry steam at 11.6 bar pressure. (continue)


0 komentar: